What the Room Needs for a Laser

Power, compressed air, water, and ventilation or filtration, plus the crate, the route in and who installs it. What Boss publishes, and where it publishes nothing.

Best-fit technology

  • Boss publishes 110 V, 60 Hz for its LS, HP and EVO CO2 machines
  • Exhaust fan and duct to the outside, or a Filtrabox filtration unit
  • Crates run 650 to 1,475 lb; the HP-5598 ships uncrated at 2,800 lb

Six things arrive with a laser, and only one of them is the laser.

A CO₂ laser comes with a chiller or water pump, an air pump or compressor, an exhaust fan and duct, and often a fume extractor. Each plugs in, takes space, or needs a path outside. The room is where projects stall: a circuit that cannot carry it, a wall that cannot take a duct, a doorway narrower than the crate. This page goes through the room in the order a facilities manager will ask about it, using only what Boss publishes in its manuals, machine pages and terms of sale, and it says plainly where Boss publishes no number.

Common starting question
Can our building take it, and who has to sign off? The pre-quote checklist →
What this page covers

Electrical, compressed air, water and cooling, ventilation or filtration, the crate and the route in, room conditions, and who installs it.

What decides the result

Whether the fume plan is settled before the quote, and whether anyone measured the route from the dock to the room.

The one thing worth knowing before anything else

For CO₂ machines, Boss’s terms of sale put the installation site with the buyer. The buyer prepares the site to the operator manual’s specifications, supplies the utilities, and manages inspection, rigging and placement. Boss provides guidance and support. So the electrician, the duct, the forklift and the floor are yours to arrange. Read the operator manual for your series before you request the quote. The manuals are public on the Support Hub.

Best fit

A CO₂ system chosen to the room you have: outlets counted, exhaust route or filtration decided, and the route from the dock measured against the crate.

Request a Quote
Electrical

Boss publishes 110 V. Count the plugs, not just the machine.

Published operating voltage and current, from Boss’s manuals and machine pages.

Boss’s LS, HP and EVO manuals all give the operating voltage as AC 110 V, 60 Hz. The machine pages add current for some models and say 220 V is available on request for the LS-1420 and LS-1630.

ModelElectrical, as Boss publishes it
EVO Desktop110 V / 60 Hz. No current figure published.
LS-1420, LS-1630110 V (220 V on request). No current figure published.
LS-2440110 V. No current figure published.
LS-3655110 V, 1,500 W / 13 A
HP-2440, HP-3655110 V, up to 20 A
HP-5598110 V, 1,500 W / 20 A

Three things follow from that table.

  • The machine is not the only load. The water chiller, the air pump or compressor, and the exhaust fan each plug in separately. The LS manual says to put the compressor switch close by and preferably on the same circuit as the chiller and exhaust fan, so the supporting equipment is on whenever the laser is. A fume extractor is another plug: Boss’s Filtrabox manuals list 120 V at 0.7 kW for the Micro and 120/240 V at 1.1 kW for the Compact X.
  • Boss’s two documents pull in different directions on circuits. The LS manual says same circuit for the support equipment. The chiller manual recommends a dedicated circuit with proper overcurrent protection and grounding, to local code, and a stable supply protected from surges. Your electrician has to resolve that for your room. Bring both manuals.
  • A laser in a school shop can run for most of the day, class after class. Under the National Electrical Code, a load expected to run three hours or more is a continuous load, and a circuit should carry no more than 80 percent of its rating continuously. On a 15-amp circuit that is 12 amps. A machine that draws 13 amps, before the chiller, does not belong on a shared 15-amp classroom circuit. That is an electrician’s call, but it is the arithmetic to bring.

One more line from Boss’s terms: the warranty does not cover damage from power surges or improper electric current. Surge protection on the supply is an inexpensive thing to settle at install and an expensive thing to discover afterward. Put any current figure Boss does not publish on the quote request, and get the answer in writing.

Compressed air and water

Air assist and cooling are both plumbing jobs.

Both are chosen when you buy. Both need a place to sit.

Air. The LS-1420 and LS-1630 are sold with an air pump or a compressor, and the LS-2440 and LS-3655 with a compressor. Every LS can run on your own air instead, and Boss’s machine pages say so. What air assist does to a cut belongs to the air assist guide. The facility points are narrower: a compressor needs an outlet, floor space and a place to drain, and Boss recommends a water and oil separator, because moisture that reaches the lens leaves spots that soften the beam. If you plan to use a building air line, ask whether it is dry and oil-free.

Water. Every Boss CO₂ tube is water-cooled, and the machine will not fire without flow. The LS manual recommends distilled water and a tube water temperature of 68 to 77°F. The chiller manual adds what the room must provide:

  • Indoor only, on a flat surface that can carry its weight with water in it.
  • At least one foot of clear space behind the rear air outlet and four inches around the two side air inlets.
  • Ambient temperature of 41 to 113°F, below 80 percent relative humidity and non-condensing, with intake air free of dust, oil mist and corrosive gas.

Winter break is a facilities event. If the water in the tube freezes it expands and breaks the tube, and Boss’s LS manual says a tube broken by freezing is not covered by the warranty. The manual’s advice is a space heater near the machine, or draining the tube and moving it somewhere temperature-controlled. An unheated shop, or a room on holiday setback, needs that in the shut-down procedure.

Ventilation and filtration

Duct it outside, or filter it. Decide before the quote.

The most common reason an institutional install stalls, and the one Boss’s manuals are most specific about.

Option 1: exhaust to the outside

Every LS ships with an exhaust fan and venting pipe. Boss’s manual calls for a 6-inch fan of at least 500 CFM on LS machines, and 250 CFM on the EVO. The duct must run outside, away from where people or animals congregate.

Option 2: filtration

Boss sells Filtrabox extractors where venting outside is not possible, because exhausting out of a room “may not be an option due to health regulations or confined space.” The air passes through pre-filter, HEPA and carbon stages and returns to the room.

Ducting out of a school building means a hole through a wall or roof. Whether that is allowed is decided by your facilities office and the authority that reviews building work. We cite no code section. Start that conversation before you choose a room.

FiltraboxBoss lists it forPublished spec
MicroLS-1416/20 and the fiber markers. Not for the LS-1630 or larger.120 V, 0.7 kW, 128 CFM, about 80 lb, 50 dB
Compact XLS and HP 1630 to 2440. Not for the 3655 or larger.120/240 V, 1.1 kW, 235 CFM, about 99 lb, 50 dB
Expand X-2LS and HP 1630 to 5598, heavy extraction.470 CFM, 53 dB, optional spark arrestor
Expand X-3LS and HP 3655 to 5598.Intelligent flow regulation; optional spark arrestor

Three facts to have before choosing filtration:

  • It is a consumable. The filters are replaced, and Boss’s shop says typically every six months, varying with daily use. The carbon filter weighs about 20 pounds in the Micro and 40 to 50 in the Compact X, per the manuals.
  • It ships on its own schedule. Boss’s shop says Filtrabox units are drop-shipped from the manufacturer, with their own lead time shown on the product page. The extractor may not arrive with the machine. Do not schedule student use until extraction is running.
  • Returns are different. Boss’s terms set a 25 percent restocking fee on fume extraction units, against 15 percent for standard machines.

Neither option makes a dangerous material safe. A filter or a duct moves smoke, it does not neutralize what PVC gives off. That rule sits upstream of any ventilation plan.

The crate and the route in

Measure the path from the dock, not the room.

Crated size and gross weight, as Boss publishes them on its machine pages.

ModelCrate (L x W x H)Gross weight
LS-142068 x 42 x 51 in650 lb
LS-163069 x 43 x 50 in1,000 lb
LS-244086 x 54 x 50 in1,300 lb
LS-365584 x 60 x 50 in1,400 lb
HP-244084 x 47 x 48 in1,300 lb
HP-365586 x 64 x 50 in1,475 lb
HP-5598Ships uncrated, 132 x 84 x 46.5 in2,800 lb
EVO DesktopNo crate size publishedNot published

Boss’s HP-2440 page gives two different machine weights, so the crated figure is shown. Boss publishes no EVO crate size. Ask for it on the quote.

What that means for the route:

  • The crate is wider than a standard door. Even the smallest LS crate is 42 inches across. Measure every door, corner, elevator and ramp on the route. Crate panels come off, so uncrating in a wide space first reduces the width you need.
  • Offloading is yours. Crates have pallet feet for a forklift or pallet jack. If a forklift is needed, Boss’s terms make the buyer supply it and the people, and risk of loss passes on delivery, before offloading. Deliveries run Monday to Friday.
  • Ask for a delivery appointment. Commercial LTL deliveries do not get one unless requested before shipment. A school that is closed, or that has no receiving staff on a given day, needs one.
  • Floor loading is not published. Your facilities office knows what the floor and route will carry.

Inspect at the dock. Boss’s documents give two windows and they differ. The LS manual says damage must be reported within 24 hours of delivery. The terms of sale say within 48 business hours (two business days) of receipt, with the damage noted on the delivery receipt at the time. Work to the shorter one. Photograph the crate before removing the bands, note any damage on the receipt, and tell your sales contact the same day.

Room conditions

What the room has to be like to run it.

From Boss’s operator manuals.

SeriesAmbient temperatureHumidity
LS39 to 104°F (5 to 40°C)5 to 95 percent, no dew
EVO39 to 104°F (5 to 40°C)5 to 95 percent, no dew
HP65 to 95°F (18 to 35°C)5 to 95 percent, no dew

The manuals ask for a dry place free from heavy pollution, vibration and strong magnetic fields, with a CO₂ or ABC extinguisher nearby. If you choose an HP to cut thin sheet metal, its manual adds an oxygen cylinder and regulator beside the machine, secured in a holder, rack or barricade, and says never to use oxygen on non-metals. Compressed-gas storage is a fire-code question of its own. Raise it early with your safety officer.

Before you request the quote

The pre-quote checklist.

Who in your building answers each question, and what to put in the request.

QuestionWho answers itPut on the quote request
Which outlets and circuits, and what current?ElectricianThe model, plus a request for current on the chiller, pump or compressor, and any extractor
Exhaust outside, or filtration?Facilities and the building-work authorityThe answer, so extraction is on the same quote
What is the narrowest point on the route?FacilitiesThe crate size for your model
Who has a forklift, and when is the dock staffed?Facilities, receivingA delivery appointment

Facility requirements FAQs

Questions a facilities manager asks.

Most of them come down to the circuit, the duct and the doorway.

Q

Can a laser run on an ordinary classroom outlet?

The voltage is standard: Boss publishes 110 V, 60 Hz. Current is the question. Boss lists 13 A for the LS-3655 and up to 20 A for the HP models, and none for the smaller LS or the EVO. The chiller, compressor and fan are extra plugs, and a continuous load should stay within 80 percent of a circuit’s rating, which is 12 A on a 15-A circuit. Have an electrician size it from the manuals before the purchase order.

Q

Do we have to vent outside, or is a filter enough?

Either works if it is sized to the machine and material. Boss’s manuals say to duct outside, away from where people congregate, or use a fume extractor, and its shop sells Filtrabox units listed by LS and HP size. A filter is a consumable that returns air to the room. Neither makes PVC safe. Decide before the quote so extraction is on the same purchase order.

Q

Will it fit through our door, and what do we need to unload it?

Probably not crated through a standard single door. Boss’s smallest LS crate is 42 inches wide and 650 lb, and the larger crates run to 1,475 lb. Crates have pallet feet for a forklift or pallet jack, and the buyer supplies the equipment and people to offload. Measure the whole route, request a delivery appointment, and inspect at the dock.

Q

What happens if the room gets cold over winter break?

Water in the tube can freeze and break it, and Boss’s LS manual says a tube broken by freezing is not covered by the warranty. Boss recommends a space heater near the machine, or draining the tube and moving it somewhere temperature-controlled. Put the shut-down steps in the written procedure.

Q

Who installs it?

For CO₂ machines, you do. Boss’s terms say the buyer prepares the site, supplies the utilities, and manages inspection, rigging and placement, with Boss providing guidance and support. On-site installation and training is listed for Boss’s fiber cutters, a different product line.

Q

Does the laser need its own room?

Boss does not require one. Its manuals say a laser, ducted correctly, can sit in an office, garage or spare room. The room still needs the exhaust or filtration plan, electrical supply, chiller clearances and a person at the machine whenever it runs. Your district’s policy may require a dedicated room.

More setup FAQs →

Sources

Boss-published: LS, HP and EVO operator manuals; the CW-5200 chiller manual; the Filtrabox Micro and Compact X manuals; Boss shop product pages and terms of sale; the LS, HP and EVO machine pages (electrical and crate figures). General source: the National Electrical Code’s continuous-load rule (a load expected to run three hours or more, Article 100; conductors sized at 125 percent of it, 210.19(A)(1), which is the same as loading a circuit to no more than 80 percent of its rating), as explained in Electrical Contractor magazine’s Sizing Conductors, Part III: Continuous Loads. We cite no building or fire-code section. Duct penetrations, gas storage and floor loading are for your facilities office.

Still deciding?

Tell us the room, and the route to it.

Send the outlet details, whether you can duct outside, and the narrowest point between the dock and the room. Ask for extraction to be priced on the same itemized quote as the machine.